Give every critical feature an inspection plan.
Use a physical model to answer a fit, clearance or inspection question before you commit to a build.


Example project
An enclosure sample for a bench review
A design team needs to see whether a cable plug clears an enclosure opening on a workbench. A short section containing the opening and its mounting references can answer that first question.
Check it in the real space
Identify the connector and drawing revision in the brief. Ask the reviewer to record which contact point limits insertion, using the same orientation as the drawing.
Use the application tool to list the team’s inspection questions, then scope the prototype and any required documentation with the studio.
Plan the design reviewWhere are you starting?
Start with this decision
Choose the one feature that your team needs to evaluate. An enclosure that must clear a connector calls for a different review than a block that locates a gauge.
Try the project toolWhat you can make
- Titanium inspection-fixture prototypes
- Non-patient instrument enclosure fit models
- Assembly-access studies and measurement aids
Read the studio’s approach
A fixture for a metrology bench and a model for an instrument design review can share the same CAD workflow. Their acceptance criteria look very different. Bring the drawing, mating hardware and intended use to ForgeCloud™ to scope a fit model, inspection aid or metal prototype. Matthew can review the requested process, inspection records and supplier availability before a production commitment.
Critical-feature review planner
Start with one feature on a controlled drawing. Build an inspection request for that feature and compare named supplier grades.
- Lower drawing limit
- 11.95 mm
- Upper drawing limit
- 12.05 mm
Identify alloy, build process, post-processing condition and the material record for the proposed lot. Record the drawing revision, datum setup and the proposed measurement method with the submission.
These are your drawing limits. Supplier specimen data, ForgeMetal™ availability, inspection capability and any NDA require separate confirmation for the project.

DMLS titanium or CNC machining? Start with the dimensions you must inspect
Questions before you start
What should accompany a titanium prototype RFQ?
Send the revision-controlled model, a dimensioned drawing, the intended use and the quantity for each revision. Mark the mating surfaces and dimensions you expect to inspect. Tell the studio whether you need a fit check, a measurement report or traceable build records so those activities can be priced.
Can we arrange an NDA before sharing a restricted design?
Text Matthew with the project classification, approximate envelope and contact for your agreement. Agree the NDA, approved recipients and transfer channel before sending proprietary geometry. ForgeCloud’s local mesh inspection lets you check an ordinary file in the browser while the agreement is under discussion.
How do we specify an ISO tolerance or inspection requirement?
Identify the governing standard and revision on the drawing, then assign the relevant dimensions, limits and datum references. Include the final surface condition. The supplier can then review whether its process, fixtures and measurement equipment can demonstrate the requirement on the finished part.
Which areas of a DMLS titanium component should be reviewed for machining?
Flag dowel bores, precision locating pads and interfaces with a controlled relationship to another feature. A machinist needs access for cutting, holding and measurement. Agree the machining allowance and inspection sequence with the selected supplier before revising nominal CAD.
Where do PEEK and ULTEM™ 9085 fit in a prototype comparison?
Specify the exact grade and fabrication route. Victrex describes 450G PEEK as granules for molding and extrusion. Stratasys publishes separate FDM data for ULTEM™ 9085. Ask for representative printed specimens and written availability if your comparison requires either material.
What evidence is available for a medical or aerospace program?
Start with the required part function, project classification and document list. Material identification, process records and part-level verification answer different questions. Qualified or regulated use requires review by the responsible organization and documented evidence for the exact supplier, build and intended use.
Sources & further reading
- Protolabs · DMLS Ti6Al4V product specifications
- Protolabs · CNC milling design guidelines
- NIST · Geometrical metrology for metal additive manufacturing
- FDA · Technical considerations for additive manufactured medical devices
- Victrex · PEEK 450G granule technical data sheet
- Stratasys · ULTEM™ 9085 FDM resin data and supporting printers